Pre-Production Samples for Custom Apparel: Cost, Timeline, What to Check, and How to Approve
November 24, 2026 · Sourcing
A pre-production sample is one finished garment, made in the bulk fabric with every logo and label in place, that you approve before the factory cuts the order. At our Sialkot factory it takes about 12 days plus courier, costs about $35 to $300 depending on the garment, and the fee is credited against a bulk order of 100 pieces or more. Bulk follows 3 to 5 weeks after approval.
Most sampling guides are written for fashion brands building a line of twelve styles. The buyer reading this is more often a club treasurer approving a jersey, a school ordering PE kit, an operations manager signing off staff shirts, or a brand owner placing a first real production run. The questions are the same: what does the sample cost, how long does it take, what exactly am I supposed to check, and how do I make sure the 300 pieces that arrive match the one I held. This guide answers from the sample room, where every custom order we make, from a 12-piece team set to a 2,000-piece uniform program, passes through the same approval before a single bulk panel is cut. It is the second fixed step in our sample-first production flow, after the spec review described in our tech pack guide.
What is a pre-production sample and how is it different from a proto or fit sample?
Garment factories use several sample names and buyers often get charged for a round they did not need. The pre-production sample, usually shortened to PP sample, is the one that matters commercially: it is built from the actual bulk fabric and trims, with the approved artwork applied in the approved positions, and the labels sewn in. Approving it means approving the garment you will receive 300 times over. The other sample types exist to get the garment to that point.
| Sample type | What it is made from | What it proves | Who needs it |
|---|---|---|---|
| Proto or development sample | Any available fabric in the right weight, often no decoration | The pattern works and the construction is buildable | Brands with a new pattern. Not needed for catalog styles. |
| Fit sample | Correct fabric or a close substitute, base size only | The measurements and ease on a body | Brands and uniform programs with their own fit. Often merged with the PP sample. |
| Lab dip and strike-off | Dyed fabric swatch, printed or embroidered test piece | Color match to Pantone, print density, stitch count | Every order with a brand color or a logo. Sent as photos first, then with the PP sample. |
| Pre-production (PP) sample | Bulk fabric, bulk trims, final artwork, final labels | The exact garment the bulk will copy | Every new style, every buyer. This is the approval that releases the order. |
| Size set | Bulk fabric, one piece of each size or of the smallest, base and largest | The grading rule holds across the range | Programs with wide size ranges, youth plus adult, or more than about 300 pieces. |
| Top of production (TOP) sample | The first finished pieces off the bulk line | The line is building what was sealed | Every bulk order. Measured and photographed as part of our inline check; the photo set is available to you before the rest is sewn. |
For a team, school or company ordering a catalog style in its own colors, the proto and fit stages are already done: the pattern has been built and corrected across previous orders. You go straight to one PP sample, usually in the base size, and that one garment carries the fit, the color and the decoration approval at once. For a brand with its own pattern and a complete tech pack, the fit sample and PP sample are often the same garment and a second round is cut only if a measurement or construction change has to be proven. The guides written for fashion startups quote two rounds as the minimum; in our sample room the number is set by how complete the brief is, not by a rule.
How much does a custom apparel sample cost?
A sample costs more than a bulk piece, often five to ten times more, and buyers comparing a $9 jersey quote against a $55 sample charge sometimes read that as a markup. It is not. A sample is cut by hand from a short length of fabric, often dyed or printed in a one-metre run, sewn by one senior tailor from start to finish instead of moving down a line of twelve operators, and decorated on a machine set up for one piece. The embroidery file is digitized and sewn out once at the start of a program whether you order 12 pieces or 1,200. The figures below are our factory-direct ranges and are estimates: the exact charge is on the quote, by style, before any work starts.
| Garment | PP sample charge, estimate | What drives it |
|---|---|---|
| Sublimated jersey, shorts, singlet | $40 to $70 per piece | Paper print run, press setup, number of panels |
| Polo, work shirt, long sleeve | $35 to $60 | Embroidery digitizing, placket and collar work |
| Hoodie, sweatshirt, quarter-zip | $45 to $80 | Fleece cutting waste, drawcord and zipper trims, print or embroidery |
| Work trousers, chinos, cargo pants | $45 to $75 | Woven cutting, pocket bags, bar tacks, waistband construction |
| Varsity, track, bomber, softshell jacket | $80 to $150 | Lining, rib knit, snaps or zipper, chenille or twill patches |
| Motorcycle textile jacket with armor pockets | $120 to $220 | Multi-layer build, armor, reflective trims, hardware |
| Leather jacket | $150 to $300 | Hide cost, hand cutting, lining, hardware |
| Courier, Sialkot to a US address | $35 to $70 per parcel | DHL, FedEx or UPS express, 3 to 6 days, declared as a commercial sample |
Three terms sit behind those numbers and you should have all three in writing before you pay a sample fee anywhere:
- Credit against bulk. We credit the sample fee against a bulk order of 100 pieces or more of that style. Below 100 pieces the fee stands, because the sample is a larger share of the order's cost. Ask any factory which threshold applies and whether the credit is per style or per order.
- Revisions included. Our sample charge covers the sample and one revision round where the change is to decoration placement, color or a measurement that can be corrected without a new garment. A second physical sample, needed when a construction or fabric change has to be proven, is charged again at the sample rate. A quote that shows a low sample price and then bills every change separately costs more by the end of round two.
- Ownership. The pattern, the graded size chart and the spec sheet we build from your brief are yours. They go to you with the sample and stay with your order record. The sample garment itself is yours once the courier leaves.
Setup charges are separate from the sample and are paid once per design, not per round: about $15 to $50 to digitize an embroidery file and about $40 to $120 for a leather patch die or an engraving file. Lab dips for a brand color and strike-offs for a print are included in the sample work on our side. Fabric that has to be dyed to a Pantone number for a single sample is sometimes replaced by the nearest stock shade on the first round, with the lab dip approved separately; the quote says which.
How long does a pre-production sample take?
About 12 days from a complete brief to a sample on the table, then 3 to 6 days by courier to a US address. That 12 days is not sewing time; a jersey is sewn in under an hour. It is the chain of small jobs that each wait on the one before, and a missing file at the start pushes every one of them.
| Step | Working days | What happens | What delays it |
|---|---|---|---|
| Spec review and query sheet | 1 to 2 | Pattern, print and purchasing read the brief; questions go back in one message | Colors as screenshots instead of Pantone numbers; logos as low-resolution JPEGs |
| Fabric and trims | 2 to 4 | Bulk fabric pulled from stock or a short dyed length ordered; zippers, rib, labels, drawcords gathered | A fabric or color not held in stock; a trim with its own minimum order |
| Pattern and size chart | 1 to 2 | Catalog block adjusted to your chart or your tech pack; grading rule checked | A retail size chart sent after the pattern is cut; regrading costs about a week |
| Artwork preparation | 1 to 2 | Sublimation print file built to the pattern pieces; embroidery digitized and sewn out; screen or DTF film made | Artwork with no placement or size stated; text under 5 mm in embroidery |
| Cut, decorate, sew, finish | 3 to 4 | One senior tailor builds the garment; press, trim, label, pack | A construction detail not in the brief that has to be queried mid-build |
| Sample QC and report | 1 | Measured against the chart, photographed and filmed in daylight, measurement report written | Nothing on your side; this step is ours |
| Courier | 3 to 6 | DHL, FedEx or UPS express with a commercial invoice marked as a sample | A missing phone number or EIN on the consignee; customs holds |
You receive the photos, the video and the measurement report on the day the sample passes our QC, before the courier leaves. Most catalog buyers give their first comments from that report and confirm them when the garment arrives, which saves the courier days from the approval cycle. A brand approving fit on a body waits for the garment. Either way, the clock on the 3 to 5 week bulk lead time starts at written approval, not at the courier delivery, and the deposit is due at the same time. For the arithmetic behind the full order, see MOQ, pricing and lead times explained.
What should you check when the sample arrives?
Measure before you judge how it looks. A garment that looks right on the table and is half an inch short in the body will be half an inch short in 300 pieces, and a measurement is a fact you can send back; "the sleeves feel long" is not. Lay the garment flat on a hard surface, smooth it without stretching, and measure the same points of measure that are on the spec sheet we sent, in the same way the sheet describes. Record the actual figure next to the spec figure, not pass or fail. These are the tolerances our sample room and our final inspection work to, and they are the ones to hold the sample to unless your spec states tighter:
| Point of measure | Knit tolerance (jerseys, polos, hoodies) | Woven tolerance (work shirts, trousers) |
|---|---|---|
| Body length, chest, waist, hip | plus or minus 1/2 inch | plus or minus 1/2 inch; waist plus or minus 1/4 inch |
| Sleeve length, inseam, outseam | plus or minus 3/8 inch | plus or minus 3/8 inch |
| Neck width, collar height, cuff, hem | plus or minus 1/4 inch | plus or minus 1/4 inch |
| Logo and number placement from a seam or edge | plus or minus 1/4 inch | plus or minus 1/4 inch |
| Logo and number size | plus or minus 1/8 inch | plus or minus 1/8 inch |
With the measurements recorded, work through the garment in this order. Each line is something we check before the sample leaves, so if you find a miss on your side, the fix is a correction to the sealed reference, not a surprise at bulk.
- Fabric. Is it the fabric on the quote, by name and weight? A 160 GSM interlock and a 140 GSM interlock look alike on a photo and not after ten washes. Compare the swatch card we send against the garment; ask for the GSM if it is not printed on the spec sheet.
- Color. Check the garment next to your Pantone reference in daylight and again under indoor light. Sublimated color on polyester and dyed color on cotton will not be identical to a printed swatch; the lab dip you approved is the reference, not the swatch book.
- Construction. Seam types as specified, stitch density (we run 10 to 12 stitches per inch on knit cover seams and 8 to 10 on woven topstitching unless the spec says otherwise), bar tacks at pocket corners, belt loops and placket ends, interlining in collars and plackets, zipper and snap function through 20 open and close cycles.
- Decoration. Every logo and number in the stated position and size, the right Pantone or thread color, sublimation with no white creep at the seams, embroidery with no puckering around the design and no loose jump stitches on the back, screen print with full coverage and a soft hand.
- Labels. Main label, size label, fiber content with the country of origin, and the care label, in the positions and text you approved. For US sale the fiber content, origin and care text are regulated; our US clothing label guide has the exact wording rules and the RN option.
- Workmanship. Thread ends trimmed, no skipped stitches, no puckering, left and right sides symmetrical within 1/4 inch, pressing clean, no marks from the sublimation press or the embroidery hoop.
- Fit on a body. Last, not first. Have someone of the base size wear it, sit, reach overhead, and bend. Note what you felt in the same language as the spec: "add 1 inch to body length", not "it rides up".
A sublimated basketball uniform, for example, has about fourteen placements between the jersey and the shorts, so the placement check is the long part of the review; a work trouser has three logo positions at most and the long part is the waistband, pocket and bar tack check. Our basketball uniform pages and varsity jacket pages each list the standard placements the sample is built to, so the brief and the check start from the same drawing.
How should you test the sample before approving it?
A sample that passes the table check can still fail the season. Four tests take under a week and catch most of what buyers later complain about. We run the first three in the factory before the sample leaves and send the results in the sample report; run them again on your side if the garment will be washed hard or worn in the sun.
| Test | How | Pass line we work to | What a fail means for bulk |
|---|---|---|---|
| Wash and shrinkage | Measure, wash three times at the care label temperature, tumble dry low, measure again | Under 3 percent on polyester knits, under 5 percent on cotton and cotton blends, no twisting of side seams | Fabric relaxation or pre-shrink needed before cutting; the chart is adjusted, not the garment |
| Color crocking | Rub a dry white cotton square ten strokes across the print and the dyed fabric, repeat with a damp square | No visible transfer dry; faint transfer wet acceptable on dark reactive dyes only | Print cure or dye fixation is wrong; the strike-off is redone before bulk |
| Stretch and recovery | Stretch a waistband, cuff or rib 50 percent, hold ten seconds, release, measure after one minute | Returns to within 1/4 inch of the original | Elastic or rib spec changes; cheap elastic is the most common cause |
| Wear | One practice, one shift, or one ride in the garment, then a look at seams, print and hardware | No seam slippage, no print cracking at stretch points, hardware still closes clean | Seam allowance or stitch type changes; a print moves off a high-stretch panel |
For garments that carry a certification, the test is not ours to run. Hi-vis workwear needs the ANSI/ISEA 107 test report from an accredited lab for the exact fabric and tape used, and a CE-marked motorcycle jacket needs the EN 17092 report for the garment construction. Those reports are ordered on the sample stage, because the sample is what the lab tests, and they add two to four weeks to the schedule for a new construction. Ask for the report number with the sample, not a promise that one exists.
How do you give sample feedback that fixes it in one round?
Most second rounds happen because the comments on the first were vague, late, or sent by three people in three threads. One message, one list, one decision. This is the format our sample room reads fastest, and it is the format we use when we send you our own measurement report:
- One line per issue, with where, what, and the fix: "Front chest logo: 1/2 inch too high, move down to 3 inches from the collar seam." A photo with a tape measure in the frame settles placement faster than any sentence.
- Severity on every line. Critical: the garment cannot ship as is (wrong fabric, wrong color, missing label, a safety trim). Major: a measurement outside tolerance or a placement wrong by more than tolerance. Minor: a thread end, a pressing mark, a preference. Critical and major items are corrected and proven; minor items are corrected at bulk and noted on the spec.
- One decision at the end. Approved; approved with the listed corrections to be made at bulk; or rejected with a second sample required. Approved with corrections is the normal outcome for a catalog style and releases the order on the day it is sent. A rejection should name the items that need a new garment to prove, because that is the only reason to cut one.
- One signatory. Decide before the sample ships who releases it. In a club that is usually the person who signed the quote; in a company it is the person who owns the uniform budget; in a brand it is the technical designer. Comments from the coach, the staff and the designer are welcome, but they are collected by the signatory into one list. Three sets of comments cost a round.
- Carry it into the spec. Every accepted correction goes into the spec sheet and the version number moves. We send the updated sheet back with the approval confirmation; it is the document the bulk is inspected against, and it is the document you take to a lawyer or a second supplier if you ever need to.
Timing matters as much as format. The fabric for your bulk is reserved, not cut, while the sample is out. A sample that sits on a desk for three weeks costs three weeks on the delivery date, and on a fabric we dye to order it can cost the dye lot. If a decision needs more time, tell us the date; we will hold the lot where we can and tell you plainly when we cannot.
What does the factory send with the sample?
A sample on its own is half the evidence. What arrives with it is what lets you approve from the desk and lets the bulk be held to the same record later. This is the packet that leaves our factory with every PP sample, and it is a fair list to ask any factory for:
- Measurement report: the spec figure, the actual figure and the difference for every point of measure, signed by the sample room checker.
- Photo and video set: front, back, both sides, inside out, every placement close up, the labels, and a 30 to 60 second video of the garment handled in daylight so the hand and drape are visible.
- Fabric swatch card: a swatch of the bulk fabric with its name, composition and GSM, and the approved lab dip for each color.
- Decoration sheet: the sew-out of each embroidery with the stitch count, or the strike-off of each print, with the thread or ink colors listed by number.
- Label layout: the text and position of every label, so the compliance wording is approved with the garment and not discovered at the port.
- Updated spec sheet and size chart: the version the sample was built to, with the grading across all sizes on the order.
- Bill of materials: fabric, lining, trims and decoration by line, which is also how the quote is built, so a change you ask for can be priced the same day.
Ask for the stitch count on embroidery and the GSM on fabric in writing because they are the two numbers most often changed quietly between sample and bulk by factories under price pressure. A 9,000-stitch crest on the sample that becomes a 6,000-stitch crest at bulk looks similar in a photo and not on a shirt. Our packet records both so there is a figure to check against on the top of production pieces.
Why does bulk sometimes differ from an approved sample, and how is that prevented?
The sample was approved, the bulk arrived, and something is off. In the cases we have seen across our own orders and those of buyers who came to us after a bad run elsewhere, the cause is almost always one of five things, and each has a control that belongs on the factory side.
| Cause | How it shows up | Control on our line |
|---|---|---|
| Different fabric lot | Shade a half step off, or a different hand | Bulk fabric is received with a shade band against the lab dip; a lot outside the band is not cut. Buyer is told if the mill lot changes. |
| Shrinkage not allowed for | Bulk measures short after the first wash | Fabric relaxed 24 hours before cutting; shrinkage test on the bulk lot, chart adjusted if the lot differs from the sample lot |
| Marker and grading errors | One size right, others wrong | A size set or a first piece of every size is measured before the full cut on orders above about 300 pieces |
| Decoration drift | Logos lower, smaller, fewer stitches | First piece of every placement checked against the sealed sample before the batch is run; stitch count fixed in the file |
| Line substitution | Different seam finish, cheaper trim | Sealed sample and BOM on the line; inline inspection at cutting, decoration and sewing; final inspection at AQL 2.5 |
Three practices tie it together. The approved sample is sealed and kept in the factory as the reference for bulk; it is the garment the line copies and the garment the inspector holds the bulk against. The first finished pieces off the line are measured and photographed as the top of production check, and the photo set is available to you before the rest is sewn, so a drift is caught at piece 20, not piece 300. And the final inspection at AQL 2.5 measures pieces from every size against the chart and its tolerances, with the photo and video report sent before the balance is due, so you see the order on the table before it ships. A recent example of the whole path is the four-brand football jersey program in our work: one shared pattern, four colorways, each colorway approved on its own PP sample before the bulk was cut.
What are the sample terms and how do you order one?
A sample starts from a brief or a tech pack, not from a deposit on a bulk order you have not seen. Send the product, the quantity per size you expect to order, colors as Pantone numbers, logo files as vector, the placements if you have a preference, the label text, and the date you need the bulk in hand. The spec review comes back in one to two working days with a quote that shows the sample charge, the unit price at your quantity, the setup charges and the lead time, with fabric, decoration and trims as separate lines. The sample fee is paid up front and credited against a bulk order of 100 pieces or more. MOQ for bulk is 30 pieces per style, team sets from 12, and the bulk terms are 50 percent deposit at sample approval and 50 percent before dispatch, with EXW, FOB, CIF or DDP to the USA on the quote.
Three ways to make the sample stage shorter, from the orders that run fastest through our sample room: send Pantone numbers and vector logos on the first message; nominate the one person who will sign the approval before the sample ships; and comment from the photo and measurement report on the day it arrives, then confirm on the garment. A buyer who does those three things usually approves within 15 days of the brief and has bulk in hand five to seven weeks later. To start, send the brief and the date through our quote form and ask for the sample charge on your style: request a quote.
Frequently asked questions
Do I have to pay for a pre-production sample?
Yes. A sample is a one-off garment cut and sewn by hand outside the production line, so it is charged at a sample rate, usually $35 to $300 depending on the garment, plus courier. We credit the sample fee against a bulk order of 100 pieces or more of that style. On a repeat of an approved style with nothing changed, no new sample is needed and nothing is charged.
Can I skip the sample for a small team order?
You can waive it in writing for a repeat order of an approved style. For a new style we do not recommend it, even at 12 to 30 pieces, because the sample is the only point where fit, color and placement are proven before the fabric is cut. A team that is short on time should send the brief and the roster together so the sample and the size chart are confirmed in one round.
How many sample rounds should I expect?
One round for a catalog style with your colors and logos, one or two for a brand style with a complete tech pack, and three or more for a sketch with no measurements. Each round is about 12 days in the sample room plus 3 to 6 days by courier, so the number of rounds is the biggest lever on your delivery date, not the bulk time.
What is the difference between a pre-production sample and a top of production sample?
A pre-production sample is made before bulk starts, from the bulk fabric and trims, to lock the fit, construction and decoration. A top of production sample is pulled from the first finished pieces of the bulk run and compared with the sealed sample to confirm the line is building what was approved. We measure and photograph the first finished pieces as part of our inline check, and that photo set is available to you before the rest is sewn.
What if the bulk arrives different from the approved sample?
Measure the pieces against the signed spec and photograph the difference next to the sample. Our sealed sample and measurement record settle whether the bulk is inside tolerance. A measurement outside tolerance or a construction that does not match the sealed sample is remade or credited; a difference inside tolerance is normal garment variation. Raise it before the balance is paid, because that is when the photo and video QC report is in your hands.
By Qasim Hussain, Founder, Alayki brand, and Managing Partner, QVR Associates.
Planning a custom order?
Send your artwork or a reference and we will come back with fabric, MOQ, price, and a real lead time, usually within one business day.
Get a Free Quote